STRUCTURE INSTALLATION PHASES

 

Installing a Nexion ventilated facade requires careful planning and precision. What was designed with dedicated CAD tools and engineering experience must be executed in the construction site with the same care. This is a simplified sequence of actions required to install a simple ventilated facade. 

 
1. Bare wall
 
2. Marking out
 
3. Drilling of holes and fitting of brackets
 
4. Fitting of vertical stand
 
5. Installation of Nexion surfaces compatible with the chosen anchor system
 
 